VELCO logo VELCO Public Outreach
The Plan -- Public Review Draft 
lines 

2009 Vermont Long-Range
Transmission Plan
Public Review Draft 

Maintaining a reliable electric system involves careful long-range planning. Every three years VELCO, the owner and operator of Vermont’s transmission system, performs a detailed analysis that identifies reliability concerns and the transmission alternatives to address those concerns. This page provides links to the Public Review Draft of the 2009 Vermont Long-Range Transmission Plan.