Lamoille County Project Scope

The Lamoille County Project is a reliability and capacity upgrade project consisting of:

  • Construction of 10 miles of new 115kV line between Duxbury and Stowe using wood structures,
    with steel and laminate wood at certain locations.
  • Relocation of a portion of the existing 34.5kV line in the same corridor using underbuild and stand alone configurations.
  • Upgrades to an existing 115kV substation - addition of a 115kV circuit breaker in Moretown
  • Construction of a new 115/34.5kV substation in Stowe

Docket 7032 - Final Lamoille County Project Line Design Plans

Cover Letter

• Plan and Profile: Duxbury to Stowe 115kV Line REV. F, Duxbury to Stowe 34.5kV Line REV. F (Attachment A)

• Drawings of the 115 kV and 34.5 kV structure types used in the improved design (Attachment B)

• Updated aesthetic mitigation plans that reflect the improvements to the design (Attachment C)

Memorandum from T.J. Boyle and Associates explaining the changes to the mitigation plans (Attachment D)

Please note that when the parallel 34.5 kV lines are not located on the same structures as the 115 kV line they are shown on separate sheets indicated by (lower voltage).Susan M. Hudson July 14, 2008 Page 2 of 5

Memorandum regarding the environmental impacts of the improvements (Attachment E)

• Chart identifying, on a structure-by-structure basis, noteworthy differences between the approved design and the improved design (Attachment F)

Addendum to Hugh Henry's Above-Ground Historic Resources Report (Attachment G)

Memorandum from Hope Luhman and Niels Rinehart discussing the impacts of the improvements on archeological resources (Attachment H)

Letter to landowners giving them notice of the new design plans (Attachment I)

 

POST CERTIFICATION

Resolution of Gregg Hill Wetland Concerns 3/30/07

Final Line Design Filing 8/25/2006

 Stowe Substation Preliminary Design DPS Filing 8/18/2006

 Updated Line Design Filing to DPS 8/01/06

Middlesex Substation Design Filing to PSB 7/28/2006

Preliminary Line Design Filing 7/14/06